Badgerow Ave - Leslieville
3 Stones worked with the homeowners and their designer to develop permit drawings and a workable budget for their main floor renovation. The project included a refresh of the front living room and dining room, a complete renovation of the kitchen, pantry, sunken family room, and the addition of a new mudroom, and bathroom. Extra space was created by converting a portion of the existing adjoining garage into a new mudroom entry way and three-piece bathroom. Features of the 4 month project include custom built-in cabinetry and a multi-zone smart heating system with hydraulic in-floor heating in kitchen, family room, mudroom, and bathroom.